Software Testing MCQ’S
1.Which of the following is considered as the component testing.
a) Black box testing
b) Grey box testing
c) White box testing
d) Both a and b
2.component testing is responsible of which of the person
a) Software tester
b) Designer
c) Developer
d) User
3.which level of testing is used to identifing the defects …
a) Acceptance testing
b) Integration testing
c) Unit testing
d) System Testing
4.Which phase is considered as software architecture phase..
a) Design
b) Implementation
c) Development
d) Requirement gathering
5.Which of the following is not a method of dynamic testing…
a) inspection
b) System testing,UAT
c) Inspection ,Walk through,Technical review
d) Unit Testing
6. As per specified requirements Which testing is concerned as the behavior of the whole product ?
a) Acceptance testing
b) Component testing
c) Integration testing
d) System testing
7.Test level is performed in which level…
a)It depends on nature of a project.
b) Unit ,System, Integration,Acceptance
c) Unit, Integration, Acceptance, System
d) Unit,Integration, System,Acceptance
8. In which phase the defect is less costly…
A. Coding
B. Design
C. Requirements Gathering
D. Implementation
9. Acceptance testing through which user is satisfied is considered as which of the following…
a. White box testing
b. Gray box testing
c. Black box testing
d. None of the above
10. tranning cost fall in which phase …
a. Failure
b. Prevention
c. Build
d. Appraisal
11. Test Readiness is conducted in which phase…
a. project manager
b. test manager
c. quality assurance
d. user or customer
12. Select which measurement taken by the two people are same refers to the term which is called as…
a. reliability
b. validity
c. calibration
d. ease of use and simplicity