Software Testing processes MCQs

Software Testing processes MCQs

overall high-level approach the Test policy is.
a. True
b. False
c. partially true
Multiple Choice Question Answer: False
Exit criteria is determined during which of the following?
a. Test Closure activity
b. Implementation and execution
c. Evaluating exit criteria and Reporting
d. Analysis and Design
e. Planning and Control
e. None of these
Multiple Choice Question Answer: Planning and Control
_____ leads a formal review process.
a. Author
b. Moderator
c. Reviewer
d. Scribe
e. None of these
Multiple Choice Question Answer: Moderator

Select the chronological record of relevant details about the execution of tests?

a. Test suite
b. Test procedure
c. Test data
d. Test log
e. None of these
Multiple Choice Question Answer: Test log
______ activities are a part of the Testing Implementation and Execution
1. from the test cases creating test suites
2. by executing test cases manually
3. Comparing actual results
4. Designing the Tests
5. Writing a test summary report
a. 1, 2, 3, 4
b. 1, 2, 3
c. 1, 2, 4
d. 1, 2, 3, 5
e. None of these
Multiple Choice Question Answer: 1, 2, 3
Test wares are handed over to maintenance team during _____ phase.
a. Test implementation and execution both
b. Test closure activity
c. Evaluating exit criteria and reporting both
d. Test analysis and design both
e. None of these
Multiple Choice Question Answer: Test closure activity
Specification should not be allowed for changing.
a. Yes
b. No
e. None of these
Multiple Choice Question Answer: Yes
if extra test cases are required or not during ________ activity tester decides.
a. Test implementation and execution
b. Test planning and control
c. Test analysis and design
d. Evaluating exit criteria
e. None of these
Multiple Choice Question Answer: Test analysis and design
Whose main task is Writing a test summary report?
a. Test Closure activity
b. Implementation and execution
c. Evaluating exit criteria and Reporting
d. Analysis and Design
e. Planning and Control
e. None of these
Multiple Choice Question Answer: Evaluating exit criteria and Reporting
______ are the criteria for deciding the testing efforts.
1. Time and budget
2. Size of development team
3. Size of testers
4. Risk associated with project

a. 1, 3, 4
b. 1, 2, 3
c. 1, 4
d. 1, 3
e. None of these
Multiple Choice Question Answer: 1, 4

Software Testing MCQs

  1. Software Acceptance testing MCQs
  2. Agile testing MCQs
  3. Boundary value analysis MCQs
  4. Capability Maturity Model Integration MCQs 
  5. Configuration Management MCQs
  6. Incident Management MCQs
  7. Independent testing team MCQs
  8. LoadRunner MCQs
  9. Black Box Testing MCQs
  10. Software quality Assurance MCQ’s
  11. Alpha and Beta Testing MCQs
  12. Manual testing MCQs
  13. Software Testing processes MCQs
  14. Software Testing Techniques
  15. Structure-based testing techniques MCQs
  16. Software Project Planning MCQs
  17. Software Design Concept Testing MCQs
  18. Software Configuration Management MCQs
  19. Smoke and Sanity testing MCQs 
  20. Selenium Software Testing MCQs
  21. SQA Analyst MCQs
  22. QA Specialist MCQs
  23. Test Manager MCQs
  24. Software Quality Assurance Engineer MCQs
  25. Software Test Automation Engineer and Static Analysis MCQs
  26. QA Engineer MCQs
  27. Director of Software Quality Assurance MCQs
  28. Software Testing Tutorials

Computer Science Repeated MCQs Book Download