Which step in SDLC includes a feasibility study? MCQsBy: Prof. Dr. Fazal Rehman | Last updated: May 20, 2025 6 Score: 0 Attempted: 0/6 Subscribe 1. Which of the following is the 2nd step in SDLC? (A) Coding (B) Maintenance (C) System Testing (D) Feasibility study 2. Which of the following is the detailed study of the existing system? (A) System Planning (B) System Analysis (C) Feasibility Study (D) Design DFD 3. Which of the following is NOT a feasibility analysis criterion? (A) Technical feasibility (B) Resource feasibility (C) Operational feasibility (D) Economic feasibility 4. The phase that is not the phase of SDLC is known as? (A) System analysis (B) System Design (C) Feasibility study (D) Problem identification 5. When a feasibility study is carried out? (A) During the period when SRS is drawn up (B) After the final SRS is drawn up (C) Before the final SRS is drawn up (D) Never 6. The feasibility study is carried out by which of the following team members? (A) Managers or supervisors of the company (B) System analyst after discussion with managers of the company (C) Users of the proposed system (D) Systems designers in consultation with the prospective users of the system Related Posts:Which of the following is the first step of sdlc?How to Create Menue in Wordpress - Step By StepWhich of the following is the first step in the recruitment process?Which enzyme catalyzes the first step of glycolysis?Which of the following is the first step of glycolysis?Which of the following is the first step in starting the research process?