Software Matrics Solved MCQsBy: Prof. Dr. Fazal Rehman | Last updated: May 20, 2025 24 Score: 0 Attempted: 0/24 Subscribe 1. : Define the task of project indicators from the following: (A) Of ongoing project help in the assessment of the status (B) Potential risk tracker (C) Track potential risk & help in the assessment of the status of an ongoing project (D) None of these 2. : Which of the following does not affect organizational performance and software quality? (A) Market (B) Product (C) Technology (D) People 3. : The project metrics are intended by: (A) Development schedule should be minimized (B) Purposes should be strategic (C) On an ongoing basis assessing project quality (D) Assessing project quality on an ongoing basis and minimization of the development schedule 4. : In SE which of the following is not a direct measure? (A) Effort Applied (B) Cost (C) Efficiency (D) All of the mentioned 5. : Select the indirect measure of product: (A) Quality (B) Complexity (C) Reliability (D) All of the mentioned 6. : Metrics are developed based on _____________ in size-oriented metrics. (A) Number of Functions (B) Number of user inputs (C) Number of lines of code (D) Amount of memory usage 7. : Which is required for determining function point in FPA is not an information domain? (A) Number of user Input (B) Number of user Inquiries (C) Number of external Interfaces (D) Number of errors 8. : In which term usability can be measured? (A) The time required to become moderately efficient in system usage (B) Intellectual skill to learn the system (C) Net increase in productivity (D) All of the mentioned 9. : For the finding of changes and variation in metrics, data are meaningful using a graphical technique is known as: (A) DRE (Defect Removal Efficiency) (B) Control Chart (C) Function points analysis (D) All of the mentioned 10. : The Dependency of DRE (Defects Removal Efficiency)? (A) D – defects found after delivery to the user (B) E – errors found before software delivery (C) Varies with project (D) Both E and D 11. : Define the task of project indicators? (A) Help in the assessment of the status of the ongoing project (B) Track potential risk (C) Help in the assessment of track potential risk & status of an ongoing project (D) None of the mentioned 12. : Which of the following does not affect organizational performance and software quality? (A) Market (B) Product (C) Technology (D) People 13. : Project metrics is intended by: (A) Minimization of development schedule (B) Assessing project quality on ongoing basis (C) For strategic purposes (D) Assessing project quality on ongoing basis and minimization of development schedule 14. : Direct measure of SE process is not referred to which? (A) Efficiency (B) Cost (C) Effort Applied (D) All of the mentioned 15. : Which refers to an indirect measure of product? (A) Quality (B) Complexity (C) Reliability (D) All of the above 16. : Metrics are developed based on the ___________________ in size-oriented metrics. (A) Number of Functions (B) Number of user inputs (C) Amount of memory usage (D) Number of lines of code 17. : In FPA which one is not an information domain required for analyzing function point? (A) Number of user Input (B) Number of user Inquiries (C) Number of external Interfaces (D) Number of errors 18. : Which term is used to measure the usability: (A) Intellectual skill to learn the system (B) In system usage time required to become moderately efficient (C) Net increase in productivity (D) All of the above 19. : If changes and variation in metrics data are meaningful, which graphical technique is used — the process is known as: (A) DRE (Defect Removal Efficiency) (B) Function points analysis (C) Control Chart (D) All of the mentioned 20. : In a link count, how can we relate the complexity of a web page? (A) Directly (B) Indirectly (C) No relation (D) All of the mentioned 21. : For a good web application, it is expected to have less number of connections. (A) True (B) False (C) None of these (D) All of above 22. : A web page that is to be built — number of dynamic web pages provides an idea about ________. (A) Size (B) Complexity (C) Effort (D) All of the above 23. : Which of the following between two or more web pages, web engineering metric measures the extent of relation? (A) How much Static Content Objects (B) How much Dynamic Content Objects (C) How much Internal Page Links (D) Web Page Similarity 24. : Which of the following in Web Page Similarity is not a classification of the web engineering metric? (A) Content based (B) Link based (C) Usage based (D) Traffic based Related Posts:Software Matrics Questions Answers MCQsIntroduction to Software (System Software vs. Application Software) MCQsSoftware reuse and software reuse oriented software engineeringSoftware Risk Management Solved MCQs with AnswerAlpha and Beta Software Testing Solved MCQsSoftware development lifecycle (SDLC) MCQs - Software Project Management