Software Configuration Management MCQs
The types of Software Maintenance are ______
a. Corrective
b. Adaptive
c. Perfective
d. All of these
e. None of these
Multiple Choice Question Answer: d
The Software Configuration Management (SCM) is called the umbrella activity.
a. False
b. True
e. None of these
Multiple Choice Question Answer: b
The main aim of Software Configuration Management (SCM) is _____
a. Identify change
b. Control change
c. To ensure that the change is being properly implemented
d. All of these
e. None of these
Multiple Choice Question Answer: d
Select the process that will ensure different versions of the system and components of the system are recorded and maintained?
a. workspace
b. code control
c. Configuration Control
d. versions
e. None of these
Multiple Choice Question Answer: c
Select the Software Configuration Management concept that aids to control change?
a. Procedure
b. Baseline
c. Audit
d. None of the above
e. None of these
Multiple Choice Question Answer: b
The output of the Software Process is _______
a. Computer programs
b. The Documents which describe the computer programs.
c. Data (within the program or external to program).
d. All of these
e. None of these
Multiple Choice Question Answer: d
The Software Configuration items are ________
a. Software Requirements
b. Design Specification
c. Source Code
d. All of these
e. None of these
Multiple Choice Question Answer: d
The task that is not a part of Software Configuration Management (SCM) is ______
a. Change control
b. Version control
c. Configuration status reporting
d. None of the above
e. None of these
Multiple Choice Question Answer: d
Which of the following combines procedures and tools to manage different versions of configuration objects that are created during the software process?
a. Configuration status reporting.
b. Version control
c. Change control
d. None of the above
e. None of these
Multiple Choice Question Answer: b
As the reliability increases, what happens to the failure intensity?
a. Increases
b. Decreases
c. No effect
d. None of the above
e. None of these
Multiple Choice Question Answer: b
Software Testing MCQs
- Software Acceptance testing MCQs
- Agile testing MCQs
- Boundary value analysis MCQs
- Capability Maturity Model Integration MCQs
- Configuration Management MCQs
- Incident Management MCQs
- Independent testing team MCQs
- LoadRunner MCQs
- Black Box Testing MCQs
- Software quality Assurance MCQโs
- Alpha and Beta Testing MCQs
- Manual testing MCQs
- Software Testing processes MCQs
- Software Testing Techniques
- Structure-based testing techniques MCQs
- Software Project Planning MCQs
- Software Design Concept Testing MCQs
- Software Configuration Management MCQs
- Smoke and Sanity testing MCQs
- Selenium Software Testing MCQs
- SQA Analyst MCQs
- QA Specialist MCQs
- Test Manager MCQs
- Software Quality Assurance Engineer MCQs
- Software Test Automation Engineer and Static Analysis MCQs
- QA Engineer MCQs
- Director of Software Quality Assurance MCQs
- Software Testing Tutorials