Alpha and Beta Software Testing Solved MCQs

By: Prof. Dr. Fazal Rehman | Last updated: May 20, 2025

38
Score: 0
Attempted: 0/38
Subscribe
1. : __________ maintenance Changes made to the system to reduce the future system failure chances.



2. : __________ model is a waterfall model.



3. : Which ISO standard is used for the software process?



4. : Suitable Data structure for the application is discussed in __________ design.



5. : __________ testing is used to demonstrate that the new release of software still performs the old one.



6. : Which statements in the context of software testing are TRUE or FALSE?



7. : __________ are Legacy Systems



8. : Testing levels are __________.



9. : One fault may lead to __________ failure.



10. : In ________ coupling, modules A and B make use of a common data type, but perhaps perform different operations on it.



11. : _______Site for Alpha Testing



12. : Fault is



13. : __________ management is the most important feature of the spiral model.



14. : Milestones are used to



15. : _________ testing is the form of Alpha and Beta Testing



16. : Which system is used for Thread testing



17. : Which testing is also known as Function testing



18. : Top-down approach is used for ___________.



19. : How many portions of the Decision table?



20. : Which leads to blocking states in which project team members wait for the other members of the team to complete the task?



21. : Which diagram helps in understanding and representing user requirements for a software project using (UML)?



22. : Which system phase of SDLC, in file conversion?



23. : It is __________ if a process is under statistical control.



24. : Which tools support different stages of the software development life cycle?



25. : _________ is a LOC measure



26. : The main aim of software engineering is



27. : Size for a project is dependent on



28. : Validation during



29. : A new system is its __________ first item defined.



30. : Each time detected and fixed, the reliability of a software product will



31. : __________ design model is analogous to the detailed drawings for access points?



32. : Which maintenance changes made to an information system to add the desired



33. : ________ is CASE Tool



34. : Which one is not a phase of “bathtub curve”?



35. : In a function-oriented design, we __________



36. : Retesting the entire application after a change has been made is called?



37. : Which Design phase will usually be



38. : Which coupling is the worst type?



 

Software Testing MCQs

  1. Software Acceptance testing MCQs
  2. Agile testing MCQs
  3. Boundary value analysis MCQs
  4. Capability Maturity Model Integration MCQs 
  5. Configuration Management MCQs
  6. Incident Management MCQs
  7. Independent testing team MCQs
  8. LoadRunner MCQs
  9. Black Box Testing MCQs
  10. Software quality Assurance MCQ’s
  11. Alpha and Beta Testing MCQs
  12. Manual testing MCQs
  13. Software Testing processes MCQs
  14. Software Testing Techniques
  15. Structure-based testing techniques MCQs
  16. Software Project Planning MCQs
  17. Software Design Concept Testing MCQs
  18. Software Configuration Management MCQs
  19. Smoke and Sanity testing MCQs 
  20. Selenium Software Testing MCQs
  21. SQA Analyst MCQs
  22. QA Specialist MCQs
  23. Test Manager MCQs
  24. Software Quality Assurance Engineer MCQs
  25. Software Test Automation Engineer and Static Analysis MCQs
  26. QA Engineer MCQs
  27. Director of Software Quality Assurance MCQs
  28. Software Testing Tutorials

Computer Science Repeated MCQs Book Download

Leave a Comment

All Copyrights Reserved 2025 Reserved by T4Tutorials