Which of the following is the first nuclear plant in India?

Question: Which of the following is the first nuclear plant in India?

A  Tarapur nuclear power plant

B  Narora  Atomic power station

C  Rana Pratap Sager Nuclear Station

D  Kalpakkam Nuclear Power Station

Answer:  Tarapur nuclear power plant

 

Nuclear Power Plant Location Type Capacity (MWe) Commissioning Date
Tarapur Atomic Power Station (TAPS) Tarapur, Maharashtra Boiling Water Reactor (BWR) 140 x 2 ·        October 28, 1969 (TAPS-1)

·        July 18, 1969 (TAPS-2)

Apsara Nuclear Reactor Mumbai, Maharashtra Research Reactor 1.0 ·        August 4, 1956
Rajasthan Atomic Power Station (RAPS) Rawatbhata, Rajasthan Pressurized Heavy Water Reactor (PHWR) 220 x 2 ·        August 16, 1973 (RAPS-1)

·        March 1, 1981 (RAPS-2)

Rana Pratap Sagar Nuclear Power Station (RAPS) Rawatbhata, Rajasthan Pressurized Heavy Water Reactor (PHWR) 100 x 1 ·        December 16, 1970 (RAPS-1)

·        September 28, 2000 (RAPS-2)

Madras Atomic Power Station (MAPS) Kalpakkam, Tamil Nadu Boiling Water Reactor (BWR) 220 x 2 ·        January 24, 1984 (MAPS-1)

·        March 21, 1985 (MAPS-2)

Narora Atomic Power Station (NAPS) Narora, Uttar Pradesh Pressurized Heavy Water Reactor (PHWR) 220 x 2 ·        January 1, 1991 (NAPS-1) July 1, 1992 (NAPS-2)
Kaiga Generating Station (KGS) Kaiga, Karnataka Pressurized Heavy Water Reactor (PHWR) 220 x 4 ·        November 16, 2000 (KGS-1) March 16, 2007 (KGS-2)

·        March 31, 2011 (KGS-3)

·        November 27, 2020 (KGS-4)

Kakrapar Atomic Power Station (KAPS) Kakrapar, Gujarat Pressurized Heavy Water Reactor (PHWR) 220 x 2 ·        May 6, 1993 (KAPS-1)

·        January 1, 1995 (KAPS-2)

Kudankulam Nuclear Power Plant (KKNPP) Kudankulam, Tamil Nadu Pressurized Water Reactor (PWR) 1000 x 2 ·        December 2000 (Unit 1 under construction)

·        July 2013 (Unit 1 operational), March 2017 (Unit 2 operational)

Gorakhpur Nuclear Power Plant (GGNPP) Fatehabad, Haryana Pressurized Heavy Water Reactor (PHWR) 700 x 4 ·        Under construction, expected to be commissioned in phases starting in the mid-2020s.
Kalpakkam Nuclear Power Station (MAPS) Kalpakkam, Tamil Nadu Prototype Fast Breeder Reactor (PFBR) 500 x 1 ·        Under construction, expected to be commissioned in the future.