1. : __________ maintenance Changes made to the system to reduce the future system failure chances.
(A) Preventive Maintenance
(B) Adaptive Maintenance
(C) Corrective Maintenance
(D) Perfective Maintenance
2. : __________ model is a waterfall model.
(A) Linear model
(B) Iterative model
(C) Rapid model
(D) Interactive model
3. : Which ISO standard is used for the software process?
(A) ISO 9000
(B) ISO 9001
(C) ISO 9003
(D) ISO 9000-3
4. : Suitable Data structure for the application is discussed in __________ design.
(A) Data
(B) Architectural
(C) Procedural
(D) Interface
5. : __________ testing is used to demonstrate that the new release of software still performs the old one.
(A) Functional
(B) Path
(C) Stress
(D) Regression
6. : Which statements in the context of software testing are TRUE or FALSE?
(S1) statement coverage will not guarantee the execution of loops in a program under test.
(S2) Use of the independent path, path testing guarantees execution of each loop in a program under test more than once.
(A) True, True
(B) True, False
7. : __________ are Legacy Systems
(A) Old System
(B) New System
(C) Underdeveloped System
(D) None of Above
8. : Testing levels are __________.
(A) Unit testing
(B) Integration testing
(C) System testing and acceptance
(D) All of the above
9. : One fault may lead to __________ failure.
(A) One
(B) Two
(C) Many
(D) All of the above
10. : In ________ coupling, modules A and B make use of a common data type, but perhaps perform different operations on it.
(A) Data
(B) Stamp
(C) Control
(D) Content
11. : _______Site for Alpha Testing
(A) Software Company
(B) Installation place
(C) Anywhere
(D) None of the above
12. : Fault is
(A) Defect in the program
(B) A mistake in the program
(C) Error in program
(D) All of the above
13. : __________ management is the most important feature of the spiral model.
(A) Requirement analysis
(B) Risk
(C) Quality
(D) Configuration
14. : Milestones are used to
(A) Know the cost of the project
(B) Know the status of the project
(C) Know user expectations
(D) None of Above
15. : _________ testing is the form of Alpha and Beta Testing
(A) Acceptance
(B) Integration
(C) System
(D) Unit
16. : Which system is used for Thread testing
(A) Real-Time
(B) Object-Oriented
(C) Event-Driven
(D) All of the above
17. : Which testing is also known as Function testing
(A) Structural
(B) Behavior
(C) Regression
(D) None of these
18. : Top-down approach is used for ___________.
(A) Development
(B) Identification of fault
(C) Validation
(D) Functional Testing
19. : How many portions of the Decision table?
(A) Four
(B) Three
(C) Five
(D) Two
20. : Which leads to blocking states in which project team members wait for the other members of the team to complete the task?
(A) Ad hoc approach of prototyping
(B) Nature of the spiral model
(C) Linear nature of classic
(D) None of the above
21. : Which diagram helps in understanding and representing user requirements for a software project using (UML)?
(A) Entity Relationship
(B) Development
(C) Data Flow
(D) Use Case
22. : Which system phase of SDLC, in file conversion?
(A) System design
(B) System development
(C) System analysis
(D) System implementation
23. : It is __________ if a process is under statistical control.
(A) Maintainable
(B) Measurable
(C) Predictable
(D) Verifiable
24. : Which tools support different stages of the software development life cycle?
(A) CASE
(B) CAME
(C) CAQE
(D) CARE
25. : _________ is a LOC measure
(A) Size-oriented metrics
(B) Function-oriented metrics
(C) Both a and b
(D) None of the above
26. : The main aim of software engineering is
(A) Program
(B) Software
(C) Within budget
(D) Software within budget given schedule
27. : Size for a project is dependent on
(A) Cost
(B) Schedule
(C) Time
(D) None of the above
28. : Validation during
(A) Process is checked
(B) Product is checked
(C) Developer performance is evaluated
(D) The customer checks the product
29. : A new system is its __________ first item defined.
(A) Storage
(B) Outputs
(C) Inputs
(D) Processing
30. : Each time detected and fixed, the reliability of a software product will
(A) Increase
(B) Decrease
(C) Remain constant
(D) Cannot say anything
31. : __________ design model is analogous to the detailed drawings for access points?
(A) Architectural design
(B) Component-level design
(C) Data design
(D) Interface design
32. : Which maintenance changes made to an information system to add the desired
(A) Preventive
(B) Adaptive
(C) Corrective
(D) Perfective
33. : ________ is CASE Tool
(A) Computer-Aided Software Engineering
(B) Component-Aided Software Engineering
(C) Constructive Aided Software Engineering
(D) Computer Analysis Software Engineering
34. : Which one is not a phase of “bathtub curve”?
(A) Burn-in
(B) Wear-out
(C) Test-out
(D) Useful life
35. : In a function-oriented design, we __________
(A) Minimize cohesion and maximize coupling
(B) Maximize cohesion and minimize coupling
(C) Maximize cohesion and maximize coupling
(D) Minimize cohesion and minimize coupling
36. : Retesting the entire application after a change has been made is called?
(A) Retesting
(B) Requirements testing
(C) Regional regression
(D) Full regression testing
37. : Which Design phase will usually be
(A) Top-down
(B) Bottom-up
(C) Random
(D) Centre fringing
38. : Which coupling is the worst type?
(A) Data coupling
(B) Control coupling
(C) Stamp coupling
(D) Content coupling