1. Select one option which is not automation?
(A) CRM Tools
(B) SCM Tools
(C) ERP Tools
(D) Operating system
2. Which one of the following is used to provide the right information to the right person at the right time for proper decision making?
(A) MIS
(B) DBMS
(C) PSO
(D) ISO
3. Characteristic for Testability function does not include _______.
(A) Simplicity
(B) Operability
(C) Robustness
(D) Observability
4. Cyclomatic Complexity is under which testing technique?
(A) Black Box
(B) White Box
(C) Yellow Box
(D) Green Box
5. Prototyping involves in software process is…
(A) Evolutionary
(B) Discrete
(C) Throwaway prototyping
(D) Both A and C options
6. Which one of the following is a sequence of statements from one place in the program to another?
(A) Gateway
(B) Route
(C) Both A and B
(D) Sub-path
7. What is the aim of the designer in software engineering?
(A) Cohesive, Coupled
(B) Coupled, Cohesive
(C) Coupled, Functional
(D) Maintainable, Cohesive
8. Loop Testing methodology successfully tested using by?
(A) Concatenated
(B) Simple loops
(C) Nested loops
(D) All of these
9. Conversion of Adjusted Function Point Count to LOC count is dependent on:
(A) Team Size
(B) Project Duration
(C) Programming Language
(D) Cost Drivers
10. Cleanroom philosophy in software engineering was first proposed by…
(A) Mills
(B) Dyer
(C) Linger
(D) All of these
11. What is an abbreviation of MTTF?
(A) Mean-Time-To-Function
(B) Manufacture-Time-To-Function
(C) Mean-Time-To-Failure
(D) None of the mentioned
12. Certification approach is not part of _____________.
(A) Generation of test cases from the end of the server
(B) Reliability
(C) Creation of usage scenarios
(D) Specific usage file
13. Which of the following is/are issues related to professional responsibility?
(A) Managing Client Relationships
(B) Intellectual Property Rights
(C) Confidentiality
(D) Both B & C
14. If Software engineers use their skills to misuse other people’s computers, what does misuse refer to?
(A) Dissemination of viruses or other malware
(B) Unauthorized modification of computer material
(C) Unauthorized access to computer material
(D) All of the mentioned
15. Software engineers shall: Which of the following is the correct statement?
(A) Make sure that the products only meet the SRS
(B) Act consistently with the public interest
(C) Act in a manner that is in the best interests of his expertise and favor
(D) Both B & C
16. Software engineers should: Which of the following is the incorrect statement?
(A) Maintain integrity and independence in their professional judgment
(B) Be dependent on their colleagues
(C) Not use your technical skills to misuse other people’s computers
(D) Not intentionally accept work that is outside your capability
17. Software product efficiency does not include:
(A) Licensing
(B) Responsiveness
(C) Processing time
(D) Memory utilization
18. Bugs and failures in the software are due to?
(A) Software Developers
(B) Software Companies
(C) None of these
(D) Both A & B
19. The organization has the best software tools and the latest computers, so they should not worry about the quality of the product.
(A) False
(B) True
(C) Both A & B
(D) None of these
20. What is Software?
(A) Software is documentation and configuration of data
(B) Software is a set of programs, documentation & configuration of data
(C) Software is a set of programs
(D) Both B & C
21. Which of the following is not responsible for software failure?
(A) Less reliable and expensive
(B) Low expectation
(C) Increasing demand
(D) Increasing supply
22. Attributes of good software are?
(A) Software Functionality
(B) Software Maintainability
(C) Software Maintainability & Functionality
(D) Software Development
23. If a user is concerned with all phases of SDLC, which model should be selected?
(A) RAD Model
(B) Waterfall Model
(C) Prototyping Model
(D) Both B & C
24. Incremental Model is a combination of?
(A) Waterfall Model & RAD Model
(B) Linear Model & RAD Model
(C) Build & FIX Model & Waterfall Model
(D) Linear Model & Prototyping Model
25. The major advantage of Incremental Model is?
(A) Easier to test and debug
(B) Easier to test and debug & It is used when there is a need to get a product to the market early
(C) Customer can respond to each increment
(D) It is used when there is a need to get a product to the market early
26. Spiral Model was initially projected by
(A) Barry Boehm
(B) IBM
(C) Royce
(D) Pressman
27. Which of the following dimensions Spiral Model has?
(A) Radial, perpendicular
(B) Diagonal, angular
(C) Diagonal, perpendicular
(D) Radial, angular
28. The disadvantage of the Spiral Model is?
(A) Strong approval and documentation control
(B) Doesn’t work well for smaller projects
(C) Additional functionality can be added at a later date
(D) The high amount of risk analysis
29. User has involvement in all phases of the Spiral Model.
(A) False
(B) True
(C) Both A & B
(D) None of these
30. How Spiral Model is different from the Incremental Model?
(A) Users can see the system early in the Incremental Model
(B) Requirements that change can be aided in Incremental Model
(C) Progress can be measured for Incremental Model
(D) Both A & B
31. A model is selected on the basis of
(A) Development team & Users
(B) Requirements
(C) Project type and associated risk
(D) All of the mentioned
32. In these two models defining requirements early in the cycle is not allowed?
(A) Waterfall & Spiral
(B) Waterfall & RAD
(C) Prototyping & RAD
(D) Prototyping & Spiral
33. If the development team has less experience on similar projects, which life cycle model can be chosen?
(A) Iterative Enhancement Model
(B) Spiral
(C) RAD
(D) Waterfall
34. Choose a model for a product/project, which has a fixed time frame and has no cost barriers.
(A) Incremental
(B) Spiral
(C) Waterfall
(D) RAD
35. If the user is not participating, which of the following models will not be able to give the desired outcome?
(A) RAD & Prototyping
(B) Waterfall & Spiral
(C) RAD & Spiral
(D) RAD & Waterfall
36. An organization is creating an advanced version of the software which is already available in the market, which model will you prefer for them?
(A) Iterative Enhancement
(B) RAD
(C) Spiral
(D) Both A & B
37. If the project development schedule is tight, can we choose a waterfall model?
(A) False
(B) True
(C) Both A & B
(D) None of these
38. Which of the following statements is true?
(A) RAD Model aids the reusability of components
(B) Prototyping Model aids the reusability of components
(C) None of these
(D) Both A & B
39. Spiral Model has high constancy requirements.
(A) False
(B) True
(C) Both A & B
(D) None of these
40. RAD Model has high constancy requirements.
(A) False
(B) True
(C) Both A & B
(D) None of these
41. ______ is not a software process quality?
(A) Timeliness
(B) Productivity
(C) Visibility
(D) Portability
42. Maintaining software costs more than it does to develop.
(A) False
(B) True
(C) Both A & B
(D) None of these
43. Which of these is not an embedded software product?
(A) Digital function of dashboard display in a car
(B) Keypad control of a security system
(C) Pattern recognition game playing
(D) Both A & B
44. The purpose of the software process is to deliver the software
(A) In time
(B) With acceptable quality
(C) Both A & B
(D) That is cost-efficient
45. Does the following activity provide a feedback report in Generic Process Framework?
(A) Deployment
(B) Modeling & Construction
(C) Communication
(D) Planning
46. Which of the following is not a type of change that we encounter during the support phase?
(A) Prevention
(B) Adaptation
(C) Correction
(D) Translation
47. Which of the following is internal software quality?
(A) Reliability
(B) Reusability
(C) Usability
(D) Scalability
48. RUP is a short form of _________ and was created by ________
(A) Rational Unified Process, IBM
(B) Rational Unified Process, Microsoft
(C) Rational Unified Process, Infosys
(D) Rational Unified Program, IBM
49. Business case for the system is established in the ______ RUP phase?
(A) Elaboration
(B) Transition
(C) Inception
(D) Construction
50. In Software Engineering, which of these is not an essential activity for software processes?
(A) Software Validation
(B) Software Design and Implementation
(C) Software Evolution
(D) Software Verification
