1. What limits the options of the project team?
(A) Constraints
(B) Assumptions
(C) Technology
(D) Deliverables
2. The work breakdown that covers the acquisition of a specific defense material item and is related to contractual effort, is called
(A) Contract WBS
(B) Contract Program WBS
(C) Program WBS
(D) None of these
3. How many types of Work Breakdown Structure are there?
(A) Three
(B) Two
(C) Four
(D) None of these
4. Why is Requirements Management important?
(A) In technology
(B) To the environment
(C) In customer’s expectations
(D) In all of the mentioned
5. Which of the following costs is not part of the total effort cost?
(A) Costs of lunch time food
(B) Costs of providing heating
(C) Costs of networking
(D) Costs of support
6. Which of the following is related to the overall functionality of the delivered software?
(A) Product-related metrics
(B) Function-related metrics
(C) Size-related metrics
(D) None of the mentioned
7. Whenever evaluating current problems and desired information, the analyst begins to
(A) Model
(B) Synthesize solutions
(C) Specification
(D) None of these
8. What is the focus of research-oriented software development?
(A) Product-related problems
(B) Process-related problems
(C) People-related problems
(D) Technology-related problems
9. What type of reviews are conducted at each of the software development phases?
(A) Analysis
(B) Design
(C) Coding
(D) All of given
10. What is considered the technical kernel of software engineering?
(A) Testing
(B) Requirement Analysis
(C) Design
(D) Implementation