Control Signals and Timing MCQs

By: Prof. Dr. Fazal Rehman Shamil | Last updated: September 20, 2024

What is the primary purpose of control signals in a microprocessor?

A. To Direct the Operation of the CPU and Peripheral Devices

B. To Store Data in Memory

C. To Perform Arithmetic Operations

D. To Manage Input/Output Operations

Answer: A. To Direct the Operation of the CPU and Peripheral Devices

Which control signal is used to indicate the start of a read operation in a microprocessor?

A. READ

B. WRITE

C. CLOCK

D. RESET

Answer: A. READ

In a synchronous system, how is the timing of control signals typically managed?

A. By a Central Clock Signal

B. By Asynchronous Events

C. By Manual Timing Adjustments

D. By Direct Wiring

Answer: A. By a Central Clock Signal

Which control signal is responsible for enabling data to be written to memory?

A. WRITE

B. READ

C. CLOCK

D. RESET

Answer: A. WRITE

What is the purpose of the CLOCK signal in a digital system?

A. To Synchronize the Operation of Components

B. To Direct Data Transfer

C. To Initialize System Settings

D. To Perform Arithmetic Calculations

Answer: A. To Synchronize the Operation of Components

Which timing parameter specifies the minimum duration for which a control signal must be asserted to be reliable?

A. Pulse Width

B. Setup Time

C. Hold Time

D. Clock Period

Answer: A. Pulse Width

In a microprocessor, which control signal indicates that the processor is ready to receive data?

A. READY

B. READ

C. WRITE

D. CLOCK

Answer: A. READY

What is the term for the time required for a signal to propagate through a logic gate?

A. Propagation Delay

B. Setup Time

C. Hold Time

D. Pulse Width

Answer: A. Propagation Delay

Which control signal is used to initialize or reset the system?

A. RESET

B. CLOCK

C. READ

D. WRITE

Answer: A. RESET

What is the function of the TIMING signal in a microprocessor?

A. To Coordinate and Schedule Data Transfers

B. To Reset the System

C. To Perform Arithmetic Operations

D. To Store Data in Memory

Answer: A. To Coordinate and Schedule Data Transfers

What does the term “setup time” refer to in digital timing?

A. The Time Required for Input Data to Be Stable Before the Clock Edge

B. The Time Required for Output Data to Be Valid After the Clock Edge

C. The Duration of a Single Clock Pulse

D. The Time for a Signal to Propagate Through a Gate

Answer: A. The Time Required for Input Data to Be Stable Before the Clock Edge

Which control signal is typically used to select a specific memory address for data access?

A. ADDRESS

B. DATA

C. CLOCK

D. RESET

Answer: A. ADDRESS

What does “hold time” refer to in digital systems?

A. The Time Required for Input Data to Remain Stable After the Clock Edge

B. The Time Required for Data to Be Stable Before the Clock Edge

C. The Duration of a Single Clock Pulse

D. The Time for a Signal to Propagate Through a Gate

Answer: A. The Time Required for Input Data to Remain Stable After the Clock Edge

Which signal is used to indicate that a device is requesting access to the system bus?

A. REQUEST

B. GRANT

C. READY

D. RESET

Answer: A. REQUEST

In synchronous systems, what determines the frequency at which control signals change?

A. The Clock Signal

B. The Data Bus

C. The Address Bus

D. The RESET Signal

Answer: A. The Clock Signal

Which control signal is used to determine whether data is being read from or written to memory?

A. READ/WRITE

B. ADDRESS

C. DATA

D. CLOCK

Answer: A. READ/WRITE

What is the primary role of the “WAIT” signal in microprocessor timing?

A. To Pause Operations Until a Condition is Met

B. To Indicate the End of a Data Transfer

C. To Initialize the System

D. To Perform Arithmetic Calculations

Answer: A. To Pause Operations Until a Condition is Met

Which timing parameter specifies the maximum delay allowed for input data to be stable after a clock edge?

A. Hold Time

B. Setup Time

C. Propagation Delay

D. Clock Period

Answer: A. Hold Time

What is the purpose of the “BUSY” control signal in a microprocessor?

A. To Indicate That a Device is Currently Occupied

B. To Request Access to the System Bus

C. To Synchronize Operations

D. To Initialize the System

Answer: A. To Indicate That a Device is Currently Occupied

Which signal indicates that the microprocessor is ready to accept new data?

A. READY

B. CLOCK

C. RESET

D. WRITE

Answer: A. READY

What does “clock period” refer to in digital timing?

A. The Duration of One Complete Clock Cycle

B. The Time for Data to Propagate Through a Gate

C. The Duration of a Single Pulse

D. The Time Required for Data to Stabilize

Answer: A. The Duration of One Complete Clock Cycle

Which control signal is used to acknowledge receipt of data from a peripheral device?

A. ACKNOWLEDGE

B. READ

C. WRITE

D. RESET

Answer: A. ACKNOWLEDGE

What is the purpose of the “ENABLE” control signal?

A. To Activate or Deactivate a Component or Device

B. To Synchronize Operations

C. To Reset the System

D. To Perform Data Transfer

Answer: A. To Activate or Deactivate a Component or Device

Which control signal is used to indicate the end of a data transfer operation?

A. END

B. READY

C. CLOCK

D. RESET

Answer: A. END

What does the term “timing diagram” refer to in digital electronics?

A. A Graphical Representation of Signal States Over Time

B. A Table of Memory Addresses

C. A Set of Control Instructions

D. A Description of the System Architecture

Answer: A. A Graphical Representation of Signal States Over Time

Which control signal is used to trigger a specific operation or event in a digital system?

A. TRIGGER

B. CLOCK

C. RESET

D. ENABLE

Answer: A. TRIGGER

What is the purpose of the “STROBE” signal in data communication?

A. To Indicate That Data is Available for Transfer

B. To Reset the System

C. To Synchronize Operations

D. To Acknowledge Receipt of Data

Answer: A. To Indicate That Data is Available for Transfer

In digital systems, what is the purpose of “data setup time”?

A. To Ensure Data is Stable Before the Clock Edge

B. To Ensure Data Remains Stable After the Clock Edge

C. To Measure Signal Propagation Delay

D. To Define the Duration of a Clock Pulse

Answer: A. To Ensure Data is Stable Before the Clock Edge

Which control signal is used to signal that a system component is not ready to proceed with an operation?

A. NOT READY

B. WAIT

C. BUSY

D. RESET

Answer: A. NOT READY

What is the role of the “SYNCHRONIZE” signal in digital systems?

A. To Align the Operation of Multiple Components

B. To Initialize the System

C. To Perform Arithmetic Operations

D. To Store Data

Answer: A. To Align the Operation of Multiple Components

Which control signal is used to initiate a memory read operation?

A. READ

B. WRITE

C. CLOCK

D. RESET

Answer: A. READ

What does the term “clock frequency” refer to in digital electronics?

A. The Number of Clock Cycles Per Second

B. The Duration of a Single Clock Pulse

C. The Time Required for Data to Propagate

D. The Number of Data Transfers Per Second

Answer: A. The Number of Clock Cycles Per Second

Which signal indicates that the data bus is currently being used by a device?

A. BUSY

B. READY

C. REQUEST

D. ACKNOWLEDGE

Answer: A. BUSY

What is the purpose of the “ACK” (Acknowledge) signal in data communication?

A. To Confirm Receipt of Data

B. To Request Data

C. To Initiate a Data Transfer

D. To Reset the System

Answer: A. To Confirm Receipt of Data

Which timing parameter specifies the maximum time allowed for data to be valid after a clock edge?

A. Propagation Delay

B. Setup Time

C. Hold Time

D. Clock Period

Answer: A. Propagation Delay

What is the function of the “INTERVAL” signal in timing diagrams?

A. To Define the Time Period Between Events

B. To Trigger a Specific Event

C. To Reset the System

D. To Perform Arithmetic Calculations

Answer: A. To Define the Time Period Between Events

Which control signal is used to determine the direction of data transfer?

A. READ/WRITE

B. DATA

C. CLOCK

D. RESET

Answer: A. READ/WRITE

What is the purpose of the “RESET” signal in digital systems?

A. To Initialize or Reset the System to a Known State

B. To Perform Data Transfer Operations

C. To Synchronize Component Operations

D. To Store Data in Memory

Answer: A. To Initialize or Reset the System to a Known State

Which signal is used to indicate that the data bus is currently available for use?

A. BUSY

B. READY

C. REQUEST

D. CLOCK

Answer: B. READY

What does the term “signal latency” refer to in digital timing?

A. The Delay Between Signal Generation and Reception

B. The Duration of a Clock Pulse

C. The Time Required for Data to Stabilize

D. The Frequency of the Clock Signal

Answer: A. The Delay Between Signal Generation and Reception

Which control signal is used to manage access to the system bus?

A. GRANT

B. REQUEST

C. RESET

D. CLOCK

Answer: A. GRANT

What is the purpose of the “ACKNOWLEDGE” signal in a microprocessor system?

A. To Confirm That a Request or Data Transfer Has Been Completed

B. To Request Data from a Peripheral Device

C. To Initiate a System Reset

D. To Synchronize Operations

Answer: A. To Confirm That a Request or Data Transfer Has Been Completed

Which timing parameter specifies the time required for data to remain stable after the clock edge?

A. Hold Time

B. Setup Time

C. Propagation Delay

D. Clock Period

Answer: A. Hold Time

What is the role of the “STROBE” signal in digital communication?

A. To Indicate That Data is Ready to be Read or Written

B. To Reset the System

C. To Synchronize Multiple Components

D. To Perform Data Transfer Operations

Answer: A. To Indicate That Data is Ready to be Read or Written

Which control signal is used to signal that a peripheral device is ready for data transfer?

A. READY

B. BUSY

C. REQUEST

D. ACKNOWLEDGE

Answer: A. READY

What is the term for the time between the clock edge and the data becoming valid?

A. Propagation Delay

B. Hold Time

C. Setup Time

D. Clock Period

Answer: A. Propagation Delay

Which timing parameter defines the minimum time interval that must elapse between two successive clock pulses?

A. Clock Period

B. Setup Time

C. Hold Time

D. Pulse Width

Answer: A. Clock Period

What does the term “data hold time” refer to in a timing diagram?

A. The Time During Which Data Must Remain Stable After the Clock Edge

B. The Time During Which Data Must Be Stable Before the Clock Edge

C. The Duration of a Clock Pulse

D. The Time for Data to Propagate Through a Gate

Answer: A. The Time During Which Data Must Remain Stable After the Clock Edge

Which signal is used to request access to the system bus from a peripheral device?

A. REQUEST

B. GRANT

C. ACKNOWLEDGE

D. READY

Answer: A. REQUEST

What is the function of the “WAIT” signal in microprocessor systems?

A. To Pause Operations Until a Condition is Met

B. To Indicate That Data Transfer is Complete

C. To Initialize the System

D. To Perform Arithmetic Operations

Answer: A. To Pause Operations Until a Condition is Met

Which control signal is used to select a specific device or memory location for data transfer?

A. ADDRESS

B. DATA

C. CLOCK

D. RESET

Answer: A. ADDRESS

What does “data setup time” refer to in the context of timing constraints?

A. The Time Required for Data to Be Stable Before the Clock Edge

B. The Time Required for Data to Remain Stable After the Clock Edge

C. The Duration of a Single Clock Pulse

D. The Time for a Signal to Propagate Through a Gate

Answer: A. The Time Required for Data to Be Stable Before the Clock Edge

What is the role of the “BUSY” signal in a microprocessor system?

A. To Indicate That a Device is Currently Occupied

B. To Request Data Transfer

C. To Signal the End of an Operation

D. To Initialize the System

Answer: A. To Indicate That a Device is Currently Occupied

Read More Computer Architecture MCQs

  1. SET 1: Computer Architecture MCQs
  2. SET 2: Computer Architecture MCQs
  3. SET 3: Computer Architecture MCQs
  4. SET 4: Computer Architecture MCQs
  5. SET 5: Computer Architecture MCQs
  6. SET 6: Computer Architecture MCQs
  7. SET 7: Computer Architecture MCQs
  8. SET 8: Computer Architecture MCQs
  9. SET 9: Computer Architecture MCQs